云南水力发电2024,Vol.40Issue(1):191-193,3.DOI:10.3969/j.issn.1006-3951.2024.01.047
城市水环境治理工程质量管理
Quality Management of Urban Water Environment Treatment Projects
倪红强 1张锐 1刘洪军1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
This paper introduces the slotting construction of urban water environment comprehensive treatment engineering(buried pipes),the unique construction characteristics and quality control process in urban streets.According to the five major processes and two 100%inspection requirements,this paper summarizes the quality control points of(buried pipe)slotting construction and explores the methods of quality management during the construction process.Finally,the quality management issues and experiences during the construction process were summarized and discussed.关键词
HDPE管/沟槽/埋管/五大工序/100%检测Key words
HDPE pipe/trench/buried pipe/five major processes/100% inspection分类
建筑与水利引用本文复制引用
倪红强,张锐,刘洪军..城市水环境治理工程质量管理[J].云南水力发电,2024,40(1):191-193,3.