论虎庄大桥人工挖孔桩施工安全管控

张静

云南水力发电2024,Vol.40Issue(1):197-200,4.
云南水力发电2024,Vol.40Issue(1):197-200,4.DOI:10.3969/j.issn.1006-3951.2024.01.049

论虎庄大桥人工挖孔桩施工安全管控

Construction Safety Control of Manual Digging Pile in Huzhuang Bridge

张静1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

Manual digging pile is considered a highly dangerous profession in construction.The central pile number of Huzhuang Bridge is ZK24+390/YK24+421,with a total length of 654 m on the left and 652 m on the right.The bridge route is divided into left and right sections.Due to the fact that the construction site is an open-air and densely populated production site,with high human machine mobility and numerous unsafe factors,accidents are prone to occur.Therefore,it is of utmost importance in safety management and must be foolproof.How to manage the safety of manual excavation pile construction is a topic that every construction manager must face seriously.To address some predictive safety risks that may occur during the construction process,this article mainly starts from the overall actual construction environment and construction risks of the project,and proposes some reference basis for on-site safety management measures.

关键词

人工挖孔桩/不安全因素/安全管理措施

Key words

manual digging pile/unsafe factor/safety management measure