东北水利水电2024,Vol.42Issue(2):1-3,57,4.
阿拉沟渠首工程除险加固设计
Design of danger control and reinforcement for Alagou canal head
张艺媛1
作者信息
- 1. 吐鲁番市清源水利水电勘测设计院有限公司,新疆吐鲁番 838000
- 折叠
摘要
Abstract
Due to the long disrepair and the limitation of construction conditions,the flood capacity of the first project of Alagou Canal in Tokxun County is insufficient,and the main buildings such as intake gate,flood-sand sluice and overflow weir are deformed and unstable,and need to be strengthened.Based on the analysis of the meteorological and hydrological characteristics of the basin,the scale and overall layout of the project are discussed in detail,and the overflow capacity,the elevation of the top of the gate and the design of energy dissipation and shock prevention are analyzed and calculated emphatically.关键词
阿拉沟河/托克逊县/渠首工程/除险加固Key words
Alagouhe River/Tokxun County/canal head project/danger control and reinforcement分类
水利科学引用本文复制引用
张艺媛..阿拉沟渠首工程除险加固设计[J].东北水利水电,2024,42(2):1-3,57,4.