阿拉沟渠首工程除险加固设计OA
Design of danger control and reinforcement for Alagou canal head
因年久失修和受建设条件的限制,托克逊县阿拉沟渠首工程过洪能力不足,进水闸、泄洪冲砂闸和溢流堰等主要建筑物变形失稳,亟需除险加固.文中通过对流域气象水文特性进行分析,对工程规模、总体布置进行了详细的论述,对各闸堰过流能力、闸顶高程和消能防冲设计进行了重点分析计算,制定的阿拉沟渠首工程的除险加固设计方案,可为类似工程设计提供参考.
Due to the long disrepair and the limitation of construction conditions,the flood capacity of the first project of Alagou Canal in Tokxun County is insufficient,and the main buildings such as intake gate,flood-sand sluice and overflow weir are deformed and unstable,and need to be strengthened.Based on the analysis of the meteorological and hydrological characteristics of the basin,the scale and overall layout of the project are discussed in detail,and the overflow capacity,the elevation of the top of the gate and the design of energy dissipation and shock prevention are analyzed and calculated emphatically.
张艺媛
吐鲁番市清源水利水电勘测设计院有限公司,新疆吐鲁番 838000
水利科学
阿拉沟河托克逊县渠首工程除险加固
Alagouhe RiverTokxun Countycanal head projectdanger control and reinforcement
《东北水利水电》 2024 (002)
1-3,57 / 4