| 注册
首页|期刊导航|东北水利水电|乌拉斯台河河道治理工程设计方案研究

乌拉斯台河河道治理工程设计方案研究

秦志刚

东北水利水电2024,Vol.42Issue(2):6-8,3.
东北水利水电2024,Vol.42Issue(2):6-8,3.

乌拉斯台河河道治理工程设计方案研究

Study on design scheme of channel management engineering for Wulastai River

秦志刚1

作者信息

  • 1. 第九师联拓勘测设计研究有限公司,新疆塔城 834601
  • 折叠

摘要

Abstract

According to the characteristics of the Wulastai River basin and the flood control requirements of the 164th Tuan River Section,the design of the Wulastai River channel management project was carried out.The paper reasonably determines the engineering form of river management,determines the design flood through the field investigation and the comparative analysis of the existing data,deduces the water surface line,determines the levee traverse,the width and height of the levee top by river sec tion,and determines the embankment section and the revetment structure by the comparative analysis of the scheme.The implementa tion of the project can create favorable conditions for ensuring regional flood control safety,protecting people's lives and property safety,and also provide a reference for the development of small and medium-sized river control projects in other areas.

关键词

乌拉斯台河/河道治理/工程设计

Key words

Wulastai River/channel management/project design

分类

水利科学

引用本文复制引用

秦志刚..乌拉斯台河河道治理工程设计方案研究[J].东北水利水电,2024,42(2):6-8,3.

东北水利水电

1002-0624

访问量0
|
下载量0
段落导航相关论文