露天矿地下水控制技术及对边坡稳定性的影响

王海 王晨光 张雁 张宏刚 黄选明 苗贺朝

煤矿安全2024,Vol.55Issue(2):194-203,10.
煤矿安全2024,Vol.55Issue(2):194-203,10.DOI:10.13347/j.cnki.mkaq.20222211

露天矿地下水控制技术及对边坡稳定性的影响

Groundwater control technology in open pit mines and its impact on stability of end-slopes

王海 1王晨光 2张雁 3张宏刚 4黄选明 3苗贺朝3

作者信息

  • 1. 中煤科工西安研究院(集团)有限公司,陕西 西安 710077||中国矿业大学 资源与地球科学学院, 江苏 徐州 221116
  • 2. 内蒙古平庄煤业(集团)有限责任公司 元宝山露天煤矿,内蒙古 赤峰 024050
  • 3. 中煤科工西安研究院(集团)有限公司,陕西 西安 710077
  • 4. 中煤科工生态环境有限公司,北京 100013
  • 折叠

摘要

Abstract

There are many rich water open-pit mines in China and the water inflow is large,if the mine groundwater or slope is not properly treated,it will face the dilemma of"water disaster,difficult strengthening of slope,and difficult mining of mines".Open pit mines in China have developed a variety of groundwater control technologies such as vertical hydrophobic holes,horizontal hy-drophobic holes,large diameter hydrophobic holes under the pit and well group hydrophobic and other pumping and draining meth-ods,drainage alleys at the bottom of the pit,pit precipitation and radiation well draining,as well as water interception curtains and water curtains such as borehole slurry curtains,concrete diaphragm wall curtains,pile-row curtains and impermeable membrane cur-tains to solve the flooding and slope instability encountered in open pit mines.The effects of groundwater control techniques on groundwater level,changes in geotechnical properties of end-slope,changes in slope stress and slope stability coefficients in open pit mines were studied,and the effects of groundwater level lifting on slope stability under the action of water curtain were analyzed.The research results show that draining or de-watering the groundwater in the open pit can effectively reduce the depth of the ground-water,reduce the water content of the slope geotechnical body,improve the cohesion and internal friction angle of the slope geotech-nical body,reduce the hydrostatic pressure and horizontal thrust of the slope body,and improve the overall stability coefficient of the slope;however,de-watering a large amount of groundwater can cause waste of water resources and pollution.The water cut-off cur-tain can solve the problems of too large a drop in groundwater level,huge volume of water drainage,waste of water resources and pollution caused by water drainage and precipitation.Under the action of water interception curtain,the water level on the outside of water interception curtain in the open pit mine keeps rising,which causes the water content of geotechnical body on the outside of water interception curtain to increase,the cohesion and internal friction angle to decrease,and the hydrostatic pressure and horizont-al thrust of slope body to increase;while the water content of geotechnical body on the inside of water interception curtain decreases,the cohesion and internal friction angle to increase,and the hydrostatic pressure and horizontal thrust of slope body to decrease,which causes the stability coefficient of slope in open pit coal mine to slightly decreased.The slope stability coefficient is still within the safe range,and it also protects the groundwater resources of the open pit mine.

关键词

露天矿/地下水控制/截水帷幕/端帮边坡/边坡稳定性系数/边坡失稳

Key words

open pit coal mine/groundwater control/water cut-off curtain/end-slope/slope stability coefficient/slope instability

分类

矿山工程

引用本文复制引用

王海,王晨光,张雁,张宏刚,黄选明,苗贺朝..露天矿地下水控制技术及对边坡稳定性的影响[J].煤矿安全,2024,55(2):194-203,10.

基金项目

国家重点研发计划资助项目(2017YFC0804100,2019YFC1805400) (2017YFC0804100,2019YFC1805400)

中煤科工集团西安研究院有限公司科技创新基金资助项目(2020XAYJS03) (2020XAYJS03)