| 注册
首页|期刊导航|煤矿安全|基于动态推演的矿山采掘计划调控系统

基于动态推演的矿山采掘计划调控系统

徐小迪 郭忠平 王蕊

煤矿安全2024,Vol.55Issue(2):228-234,7.
煤矿安全2024,Vol.55Issue(2):228-234,7.DOI:10.13347/j.cnki.mkaq.20230980

基于动态推演的矿山采掘计划调控系统

Mine mining plan regulation system based on dynamic deduction

徐小迪 1郭忠平 1王蕊1

作者信息

  • 1. 山东科技大学 能源与矿业工程学院,山东 青岛 266590
  • 折叠

摘要

Abstract

Mine mining plan preparation is an important work in the production management of mining enterprises.The traditional manual preparation of mining plan is not well adapted to the increasingly complex coal mine production environment,which leads to problems such as tight mining succession.Therefore,a mine mining plan control system is designed based on dynamic inference.This system adopts the dynamic planning method,according to the characteristics and requirements of mining production,estab-lishes a dynamic deduction model,calculates the appropriate production cycle and the amount of coal to be mined in each quarter,and realizes the dynamic deduction of the mining process with the help of the database model of GIS and software such as Auto-CAD.In order to cope with the situation that the production plan can not be completed on time,by setting up the outline level and setting the connection relationship between different tasks,the problem of tense mining succession is effectively avoided,and optim-ization calculations are realized with the help of computers to achieve the dynamic regulation of the mine mining plan.

关键词

矿山采掘计划/调控系统/动态推演/GIS/数据库/矿山生产管理/采掘接替

Key words

mine extraction plan/regulation system/dynamic deduction/GIS/database/mine production environment/tense min-ing succession

分类

矿业与冶金

引用本文复制引用

徐小迪,郭忠平,王蕊..基于动态推演的矿山采掘计划调控系统[J].煤矿安全,2024,55(2):228-234,7.

基金项目

山东省自然科学基金资助项目(ZR2023QE030) (ZR2023QE030)

煤矿安全

OA北大核心CSTPCD

1003-496X

访问量4
|
下载量0
段落导航相关论文