| 注册
首页|期刊导航|中国防汛抗旱|上海市苏州河高水位成因分析及对策研究

上海市苏州河高水位成因分析及对策研究

韦浩 俞汇 李琪 易文林

中国防汛抗旱2024,Vol.34Issue(2):63-67,5.
中国防汛抗旱2024,Vol.34Issue(2):63-67,5.DOI:10.16867/j.issn.1673-9264.2023127

上海市苏州河高水位成因分析及对策研究

Cause analysis and countermeasures of rising flood stage in Suzhou River in Shanghai City

韦浩 1俞汇 1李琪 1易文林1

作者信息

  • 1. 上海市水文总站,上海 200232
  • 折叠

摘要

Abstract

In recent years,the stage rising trend of the Suzhou River has been significant,and the flood stage has repeatedly exceeded historical records.In order to analyze the situation and the causes of the flood stage during the Typhoon Muifa in 2022,and explore the countermeasures for the flood stage changes,we use the Mann-Kendall trend test and Spearman trend test to analyze the annual extreme value series of stage,and use the hydrologic model method to invert the flood stage process during the Typhoon Muifa.Under the current engineering situation,the contribution ratio of the two factors both torrential rain and storm surge during the Typhoon Muifa,to the flood stage is about 8∶2.In the future,if the new West Gate of the Suzhou River and the Deep Tunnel project of the Suzhou River participate in project scheduling,the maximum flood stage of the Suzhou River can be reduced by 0.26 m.If the new Huangpu River estuary gate is built,the maximum flood stage of the Suzhou River can be reduced by 0.55 m.These projects can significantly improve the flood and drainage capacity on both sides of the Suzhou River,especially in the central urban of Shanghai city.

关键词

高水位/苏州河/台风"梅花"/趋势检验/上海市

Key words

high water level/Suzhou River/Typhoon Muifatrend/trend testing/Shanghai City

分类

天文与地球科学

引用本文复制引用

韦浩,俞汇,李琪,易文林..上海市苏州河高水位成因分析及对策研究[J].中国防汛抗旱,2024,34(2):63-67,5.

中国防汛抗旱

1673-9264

访问量0
|
下载量0
段落导航相关论文