摘要
Abstract
Taking an outside door and window of a project building in Fujian province as an example,this paper analyzes the air tightness test method and data processing method,and expounds the field quality problems in water tightness test,as well as the door and window repair can meet the water-tightness requirements.According to the project situation,the wind load standard value of the project is 926 Pa.According to the characteristics of the high-rise buildings,2 500 Pa is selected as the wind resistance performance index to ensure the accuracy of the wind resistance test.关键词
建筑工程/门窗/气密/水密Key words
Construction engineering/Doors and windows/Airtight/Water tightness分类
建筑与水利