Taking the dewatering design scheme of the main deep foundation pit of Yiting Road station of Suzhou rail Transit Line 3 as an example,the paper carries out the technical research on the dewatering design scheme of the deep foundation pit of Yiting Road Station.Through the analysis of the characteristics and difficulties of the dewatering project,three-dimensional seepage numerical method is used for simulation analysis,foundation pit stability analysis and dewatering deep well design to ensure the safety of deep foundation pit excavation and support construction process to ensure the stability of deep foundation pit slope,providing theoretical basis and experience for the design and construction of decompression dewatering.关键词
夷亭路站/地铁车站/深基坑降水/三维渗流分析Key words
Yiting Road Station/Subway stations/Deep foundation pit dewatering/Three-dimensional seepage analysis分类