四川轻化工大学学报(自然科学版)2024,Vol.37Issue(1):79-85,7.DOI:10.11863/j.suse.2024.01.10
盾构隧道伴行对高压管线变形的影响分析
Analysis of Influence of Shield Tunnel Alignment on Deformation of High Pressure Pipeline
摘要
Abstract
The construction of a shield tunnel inevitably causes disturbance of surrounding rock and soil,which in turn affect the deformation and settlement of underground pipelines.The greater pressure inside the pipeline is,the more stringent deformation control of the pipeline becomes.Relying on the nitrogen-oxygen pipeline project accompanied by a tunnel in an interval,numerical simulation and field monitoring are used to analyze the impact of shield tunneling on the settlement of high-pressure pipelines accompanying.The results show that the maximum settlement value of 3.96 mm for pipeline containing high pressure is 4%more than that of 3.83 mm for the unpressurised pipeline,which is within the safe range of 20 mm and will not cause pipeline rupture.The distance between the pipeline and the centerline of the shield is an important factor affecting the deformation and settlement.Therefore,special attention should be paid to the settlement and deformation of high-pressure pipelines during shield excavation,especially to the high-pressure pipelines close to the centerline of the shield.关键词
高压管线/双线盾构/管线变形/管线伴行/Plaxis 3DKey words
high pressure pipeline/double-line shield/pipeline deformation/pipeline accompanying/plaxis 3D分类
建筑与水利引用本文复制引用
席培胜,周冠宇,张军..盾构隧道伴行对高压管线变形的影响分析[J].四川轻化工大学学报(自然科学版),2024,37(1):79-85,7.基金项目
安徽省自然科学基金青年项目(2208085QE142) (2208085QE142)
安徽省高等学校自然科学基金重点项目(KJ2019A0742) (KJ2019A0742)