| 注册
首页|期刊导航|水利水电技术(中英文)|绿塘整体浇筑堆石混凝土拱坝施工期温度仿真研究

绿塘整体浇筑堆石混凝土拱坝施工期温度仿真研究

何涛洪 徐小蓉 雷峥琦 成克雄 曾旭 金峰

水利水电技术(中英文)2024,Vol.55Issue(1):51-61,11.
水利水电技术(中英文)2024,Vol.55Issue(1):51-61,11.DOI:10.13928/j.cnki.wrahe.2024.01.005

绿塘整体浇筑堆石混凝土拱坝施工期温度仿真研究

Temperature simulation on construction period of Lyutang integral casting arch dam of rock-filled concrete

何涛洪 1徐小蓉 2雷峥琦 3成克雄 1曾旭 1金峰4

作者信息

  • 1. 遵义市水利水电勘测设计研究院有限责任公司,贵州遵义 563002
  • 2. 华北电力大学 水利与水电工程学院,北京 102206
  • 3. 中国水利水电科学研究院,北京 100038
  • 4. 清华大学 水圈科学与水利工程全国重点实验室,北京 100084
  • 折叠

摘要

Abstract

[Objective]Lyutang dam is an integral casting rock-filled concrete(RFC)arch dam with no transverse joints,and it is developed aiming to solve the problems of much construction interference,slow construction speed and low rockfill rate caused by excessive joints.In order to explore the temperature field distribution characteristics and stress variation patterns of this new type arch dam,and obtain the theoretical basis for the non or few joints of the rockfill concrete dam body,[Methods]the finite element(FEM)simulation was performed based on measured temperature data,considering various factors such as the upstream anti-seepage layer,prefabricated concrete block templates,concrete hydration reactions,elastic modulus growth and creep.The software SAPTIS for the structural multiphysics simulation and nonlinear analysis was utilized to simulate the whole pouring process of layered arch rings,and analyze the temperature distribution and stress propagation for the integral casting arch dam.[Results]The results show that the hydration temperature rise of RFC concrete during the construction period of Lyutang dam is relatively low,about 3~10 ℃.For some hot months,the concrete temperature after rising can reach up to 38.6 ℃.The arch tensile stress of Lyutang dam during construction is generally less than 0.8 MPa,but only the local stress of the upstream im-pervious layer with self-compacting concrete reaches 1.5 MPa.The prefabricated concrete templates play a role in auxiliary heat absorption and mechanical constraint.The transverse joints can greatly improve the upstream stress of an arch dam.[Conclusion]The results demonstrate that it is feasible to adopt the dam type of integral casting RFC with no transverse joints,which is poured by the whole rising of full section,but it is suggested to set up short joints in the upstream impervious layer and take appropriate temperature control measures in hot seasons.This dam type is of great significance to promote the development of rapid dam construction technology.

关键词

堆石混凝土拱坝/整体浇筑/温度仿真/横缝/变形

Key words

rock-filled concrete arch dam/integral casting/temperature simulation/transverse joint/deformation

分类

水利科学

引用本文复制引用

何涛洪,徐小蓉,雷峥琦,成克雄,曾旭,金峰..绿塘整体浇筑堆石混凝土拱坝施工期温度仿真研究[J].水利水电技术(中英文),2024,55(1):51-61,11.

基金项目

贵州省水利科技经费(KT201805) (KT201805)

贵州省2021年科技支撑计划项目(黔科合[2021]一般359) (黔科合[2021]一般359)

水利水电技术(中英文)

OACSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文