摘要

Abstract

During the construction of soft foundation sluices in the Dongting lake area,uneven settlement is prone tooccur,this paper studies the uneven settlement of the foundation during the construction of the floodgate project in the east of Datong Lake,introduces the project overview,geological conditions,foundation design and settlement treatment process and measures,analyzes the causes of uneven settlement,and summarizes the control ideas and methods of uneven settlement of soft ground sluice in the Dongting Lake area,so as to provide reference for similar projects.

关键词

洞庭湖区/软土地基/水闸/不均匀沉降/水泥土搅拌桩

Key words

Dongting Lake District/soft foundation/sluice gates/Uneven settlement/Cement-soilmixingpile