海河水利Issue(2):5-8,4.DOI:10.3969/j.issn.1004-7328.2024.02.002
南运河冬季输水冰情及对策研究
Ice Condition in Winter and Countermeasures during the South Canal
边昱丞1
作者信息
- 1. 河北省南运河河务中心,河北 沧州 061000
- 折叠
摘要
Abstract
The winter water conveyance work of the South Canal is less carried out,resulting in insufficient experience.The northern extension of the eastern route of the South-to-North Water Diversion Project in 2022-2023 is the first winter water conveyance since the line was put into operation.During the water conveyance period,two observation stations,Anling and Beichentun,were set up in the South Canal section to observe the characteristics of the ice regime at each stage of water conveyance during the ice period,so as to understand and master the changing law of the ice regime.In this paper,the ice conditions and the water transportation countermeasures in the northern Yannan Canal section of the eastern route of the South-to-North Water Transfer Project are studied,providing reference and suggestions for the water transportation in the ice period in the future.关键词
南水北调东线/冰期输水/冰情/对策研究Key words
eastern route of the South-to-North Water Transfer/water transportation during glacial period/ice condition/countermeasures分类
建筑与水利引用本文复制引用
边昱丞..南运河冬季输水冰情及对策研究[J].海河水利,2024,(2):5-8,4.