G311线永城境改建工程跨河桥梁防洪评价
Flood Control Evaluation of G311 Reconstruction Project Cross River Bridge in Yongcheng City
蔡磊 1许天一 1蔡霞2
作者信息
- 1. 长江水利委员会长江下游水文水资源勘测局,江苏 南京 210011
- 2. 珠江水利委员会珠江水利综合技术中心,广东 广州 510611
- 折叠
摘要
Abstract
According to the Flood Control Law of the People's Republic of China and relevant laws and regulations,flood control evaluation should be conducted for construction projects within river management,and flood control evaluation reports should be prepared.Ensuring the safety of river flood discharge is an important foundation for bridge construction when building bridges on rivers.Therefore,flood control evaluation of cross river bridges is important.According to relevant laws,regulations,code standard and the requirements of the project planning approval documents,combined with the river evolution,existing water conservancy facilities and the implement arrangements of the water project,the technical route is reasonably determined.Based on the analysis and calculation of hydrology,banked-up water,erosion and deposition,river regime impact,a comprehensive evaluation is conducted on the flood control of the cross river bridge of Yongcheng National Highway 311 Yongcheng Reconstruction Project,and proposes the prevention and control measures for project impact.关键词
跨河桥梁/防洪评价/水文/壅水/冲刷Key words
crossing bridge/flood preventing evaluation/hydrology/banked-up water/scour分类
建筑与水利引用本文复制引用
蔡磊,许天一,蔡霞..G311线永城境改建工程跨河桥梁防洪评价[J].海河水利,2024,(2):59-63,5.