| 注册
首页|期刊导航|海河水利|门槽充水对塔式进水口工作性态的影响研究

门槽充水对塔式进水口工作性态的影响研究

周小姿 周清勇 郝昌言

海河水利Issue(2):92-95,103,5.
海河水利Issue(2):92-95,103,5.DOI:10.3969/j.issn.1004-7328.2024.02.024

门槽充水对塔式进水口工作性态的影响研究

Influence of Water-filling Gate Slot on Tower Type lntake Working Behavior

周小姿 1周清勇 2郝昌言1

作者信息

  • 1. 上饶市国控水利水电工程建设监理有限公司,江西 上饶 334001
  • 2. 江西省水利科学院,江西 南昌 330029
  • 折叠

摘要

Abstract

As an important water conveyance structure,culvert pipes under the dam are widely used in in earth-rock dam engineering.When the tower column structure of the water inlet hoist shaft encounters the design water level or even the check water level,the working gate slot and the maintenance gate slot in the shaft will often be filled with water,at this time,the stress state of the structure is different from that under the normal water level.In this paper,the finite element method is used to simulate a project and analyze the influence of sluice slot filling on the working behavior of tower inlet.The results show that the structural displacement and stress distribution laws are basically consistent under various working conditions,and the values are small.Under the check flood level,the bulkhead gate slot and the service gate slot are full of water.At this time,the structural displacement and the main tensile stress are less than the normal water storage level.Therefore,the water filling of the sluice slot can enhance the stability and safety margin of the structure.

关键词

塔式进水口/门槽/有限元数值模拟/影响性分析

Key words

tower water inlet/gate slot/finite-element simulation/impact analysis

分类

建筑与水利

引用本文复制引用

周小姿,周清勇,郝昌言..门槽充水对塔式进水口工作性态的影响研究[J].海河水利,2024,(2):92-95,103,5.

海河水利

1004-7328

访问量2
|
下载量0
段落导航相关论文