煤气与热力2024,Vol.44Issue(2):后插6-后插9,4.
大型LNG薄膜罐施工期空调系统建设
Construction of Air Conditioning System during Construction Period of Large LNG Membrane Tanks
赖建波 1常旭宁 1詹一鸣 2侯谨城 1姜波 2郭保玲 1王佩广1
作者信息
- 1. 北京市燃气集团研究院,北京 100011
- 2. 北京燃气集团(天津)液化天然气有限公司,天津 300163
- 折叠
摘要
Abstract
In order to ensure that the construc-tion environment for painting the moisture-proof layer on the inner wall of the outer tank of the LNG membrane tank and installing the insulation board meets the re-quirements,a set of air conditioning system is construc-ted.The indoor unit of the air conditioning system is placed inside the tank,and the outdoor unit is placed outside the tank.The processed air is sent to the inner wall of the outer tank of the LNG membrane tank through a vertical air duct.The air supply outlet adopts an orifice,which can achieve good air supply effect.Ac-cording to the engineering application,the air condition-ing system can provide environmental conditions that meet the requirements for membrane tank construction.关键词
LNG薄膜罐/空调系统/竖直风管/施工环境Key words
LNG membrane tank/air condi-tioning system/vertical air duct/construction environ-ment分类
能源科技引用本文复制引用
赖建波,常旭宁,詹一鸣,侯谨城,姜波,郭保玲,王佩广..大型LNG薄膜罐施工期空调系统建设[J].煤气与热力,2024,44(2):后插6-后插9,4.