长江中游荆江水沙过程变异与三口洪道通流能力响应分析OA
Water and Sediment Process Variation in Jingjiang River in the Middle Reaches of the Yangtze River and Response Analysis of Flow Capacity of Three Outlets
长江中游荆江河段通过三口洪道与洞庭湖连通,形成了极其复杂而又影响深远的江湖关系.长江三峡工程的调度运行改变了坝下游荆江河道天然水沙过程,引起干流洪水过程"坦化",中水时期延长,枯水流量增加,促发了三口洪道对上述新水沙条件的持续响应.采用近70a长系列实测水文整编数据及河道地形观测成果,分析了三口洪道对荆江水沙变异过程的响应特点,总结了口门段分流分沙、河势及洪道冲淤演变规律.结果表明:三峡工程运行前后同等来水条件下三口分流比有所减小,分沙量与上游枝城来沙相应,分沙比延续其逐渐增大的特征;三峡水库蓄水运用后,三口洪道河床总体呈冲刷状态,2003-2011 年总冲刷量为 0.514 7 亿 m3,2011-2016 年为0.99 亿m3,洪道口门均有所扩展,但实际通流能力尚未得到显著改善.
The Jingjiang reach of the middle reaches of the Yangtze River is connected to Dongting Lake through three outlets,forming an extremely complex and far-reaching relationship between the rivers and lakes.The operation of the Three Gorges Project has changed the natural water and sediment process in the Jingjiang River downstream of the dam.This leads to"flattening"flood processes in the main stream,extended middle water period,and an increase in low flow,which has promoted the continuous response of the three outlets to the above water and sediment conditions.Meanwhile,this paper employs a series of long-term measured hydrological consolidation data and river channel terrain observation results from nearly 70 years.Based on this,the response characteristics of the three outlets to the water and sediment variation process of the Jingjiang River are analyzed,and the flow and sediment diversion,river regime,and erosion and sedimentation evolution laws in the entrance area are summarized.The results show that in the same inflow conditions before and after the operation of the Three Gorges Project,the diversion ratio of three outlets decreases,and the sediment diversion corresponds to the sediment from the upstream branch city.Additionally,the sediment diversion ratio continues its gradually increasing trend.After the impoundment and operation of the Three Gorges Reservoir,the riverbed of three outlets is generally in a state of erosion,with a total erosion amount of 51.47 million m3 from 2003 to 2011 and 99 million m3 from 2011 to 2016.The entrance areas have been expanded,but the actual flow capacity has not been significantly improved.
沈健;原松
长江水利委员会水文局荆江水文水资源勘测局,湖北 荆州 434000长江水利委员会水文局,湖北 武汉 430010
水利科学
三口洪道河道演变通流能力荆江
three outletschannel evolutionflow capacityJingjiang River
《人民珠江》 2024 (002)
53-59 / 7
国家重点研发计划资助(2022YFC3201801)
评论