四川水力发电2024,Vol.43Issue(1):143-146,4.
浅谈水电站工程剩余物资由基建交付电力生产后存在的问题及解决措施
A Brief Discussion on the Problems and Solutions after the Surplus Materials of the Hydropower Station Project Are Delivered from the Infrastructure to Power Production
赵宇阳1
作者信息
- 1. 国能大渡河大岗山发电有限公司,四川 石棉 625409
- 折叠
摘要
Abstract
The surplus materials of hydropower station projects are mostly produced by the capital construction unit for various reasons,and it's common that there are a certain number of surplus materials in the construc-tion of the project.The problems of the surplus materials of the project after being delivered from the capital construction to the power production are considered,and the corresponding solutions are put forward from the perspective of finance and audit in this paper.It provides a certain reference for the power production units that have received the project surplus materials when dealing with the project surplus materials.关键词
ERP系统/电力生产/工程剩余物资Key words
ERP system/Power production/Project surplus materials分类
管理科学引用本文复制引用
赵宇阳..浅谈水电站工程剩余物资由基建交付电力生产后存在的问题及解决措施[J].四川水力发电,2024,43(1):143-146,4.