| 注册
首页|期刊导航|天津建设科技|某220×104t/a煤炭物流基地装卸站改扩建方案研究

某220×104t/a煤炭物流基地装卸站改扩建方案研究

徐娜 孙宇

天津建设科技2024,Vol.34Issue(1):1-3,3.
天津建设科技2024,Vol.34Issue(1):1-3,3.DOI:10.3969/j.issn.1008-3197.2024.01.001

某220×104t/a煤炭物流基地装卸站改扩建方案研究

Study on the Reconstruction and Expansion Scheme of A 2.2×104 t/a Coal Logistics Base Loading and Unloading Station

徐娜 1孙宇1

作者信息

  • 1. 中铁第六勘察设计院集团有限公司,天津 300308
  • 折叠

摘要

Abstract

Based on the requirement of railway station capacity in the expansion of a coal logistics base project,this pa-per studies three reconstruction schemes of existing loading and unloading stations,through comparison and selection,and determines the half-train unloading scheme with unloading line of"small reconstruction quanti-ty,less investment,short station apron length and less newly requirement land".

关键词

铁路货运站/扩能改造/煤炭物流基地/低货位/能力检算

Key words

railway freight station/capacity expansion/coal logistics base/low freight station/capability check

分类

交通工程

引用本文复制引用

徐娜,孙宇..某220×104t/a煤炭物流基地装卸站改扩建方案研究[J].天津建设科技,2024,34(1):1-3,3.

基金项目

中铁第六勘察设计院集团有限公司科研项目(YW-2022-01) (YW-2022-01)

天津建设科技

1008-3197

访问量0
|
下载量0
段落导航相关论文