珠江口隧道水下近距离侧穿桥桩影响分析

吴仲伦 李腾飞 于勇

天津建设科技2024,Vol.34Issue(1):4-7,15,5.
天津建设科技2024,Vol.34Issue(1):4-7,15,5.DOI:10.3969/j.issn.1008-3197.2024.01.002

珠江口隧道水下近距离侧穿桥桩影响分析

Analysis on the Influence of Short Distance Lateral Crossing of Bridge Piles in Pearl River Estuary Tunnel

吴仲伦 1李腾飞 2于勇2

作者信息

  • 1. 中国铁路广州局集团公司 江门工程建设指挥部,广东 江门 529100
  • 2. 中铁第六勘察设计院集团有限公司, 天津 300308
  • 折叠

摘要

Abstract

In order to ensure the operationof existing traffic safety structures during the short distance construction of shield tunnel this paper takes the No.48 and 49 of Fuzhou Bridge Pier Engineering,which nearby passes through shield section on Wanqingsha of Pearl River Estuary tunnel as an example,establishes a detailed nu-merical simulation model considering multiple factors such as grouting behind the wall and formation loss rate.The safety assessment and analysis were carried out on the interaction between pile piles of shield side cross-ing Fuzhou Bridge after formation reinforcement.The results show that the strengthening measures are reason-able and effective,which can control the deformation of bridge pile and soil around the pile.

关键词

隧道工程/盾构法/桥桩

Key words

tunnel engineering/shield method/bridge piles