考虑温度变化下三层复合衬垫中重金属污染物一维运移理论模型OA北大核心CSTPCD
Theoretical model for one-dimensional transport of heavy metal contaminants in a triple-layer composite liner considering temperature change
针对考虑温度变化下由土工膜(geomembrane,简称GM)+土工复合膨润土衬垫(geosynthetic clay liner,简称GCL)+压实黏土衬垫(compacted clay liner,简称CCL)组成的3层复合衬垫中重金属污染物一维运移问题,基于相关假定发展得到了热传导与重金属污染物运移的控制方程,并建立了相应理论模型.通过有限差分,对所建理论模型进行了数值求解.随后,开展了与试验结果、解析解计算结果以及其他数值解计算结果的对比…查看全部>>
Aiming at the problem of one-dimensional transport of heavy metal contaminants(HMCs)in a triple-layer composite liner composed of geomembrane(GM),geosynthetic clay liner(GCL)and compacted clay liner(CCL)under the consideration of temperature change,the governing equations for thermal conduction and HMCs transport are developed based on the relevant assumptions,and a corresponding theoretical model is established.The theoretical model constructed in this stud…查看全部>>
江文豪;冯晨;李江山
中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉 430071||中国科学院大学,北京 100049||中国科学院武汉岩土力学研究所污染泥土科学与工程湖北省重点实验室,湖北武汉 430071中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉 430071||中国科学院大学,北京 100049||中国科学院武汉岩土力学研究所污染泥土科学与工程湖北省重点实验室,湖北武汉 430071中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,湖北武汉 430071||中国科学院武汉岩土力学研究所污染泥土科学与工程湖北省重点实验室,湖北武汉 430071
环境科学
温度变化热传导重金属污染物运移3层复合衬垫理论模型击穿时间
temperature changethermal conductionheavy metal contaminants transporttriple-layer composite linertheoretical modelbreakthrough time
《岩土力学》 2024 (2)
417-432,16
国家重点研发计划(No.2019YFC1804002).This work was supported by the National Key Research and Development Program of China(2019YFC1804002).
评论