长江科学院院报2024,Vol.41Issue(3):9-15,7.DOI:10.11988/ckyyb.20221510
鄱阳湖水利枢纽对江湖洪期水动力过程的影响
Impacts of the Poyang Lake Water Conservancy Hub Project on Hydro-dynamic Process in Flood Period of Yangtze River and Poyang Lake
摘要
Abstract
Poyang Lake,which connects to the Yangtze River,has historically suffered from frequent flooding,with the flood process being influenced by various factors.The construction of the Poyang Lake Project(PLP)will bring about alterations to the complex hydrodynamic processes in flood periods.This study aims to examine the impacts of PLP using a two-dimensional hydrodynamic model.The severe flood in 1954 and the backward flow in 1991 were selected as scenarios to simulate the potential impacts with and without the PLP.The findings indicate that the PLP will moderate the discharge process at Hukou and reduce the peak flood value,while leaving the water level in the Yangtze River unchanged.In the scenario of the severe flood in 1954,PLP raises the water level in Poyang Lake,resulting in a maximum water level increase of 0.021 m at representative hydrological stations.Conversely,in the scenatio of backward flow in 1991,PLP reduces the water level in the lake region.The fluctuation pattern of water level aligns with the discharge process at Hukou,while the phase of water level slightly lags behind the flow process.The research outcomes offer technical support for ensuring the safety of both the Yangtze River and Poyang Lake.关键词
水动力过程/鄱阳湖/水利枢纽/洪期/MIKE21 FM模型/数值模拟Key words
hydro-dynamic process/Poyang Lake/Water Conservancy Hub Project/flood period/MIKE21 FM model/numerical simulation分类
建筑与水利引用本文复制引用
刘玉娇,余明辉,黄宇云,吴华莉..鄱阳湖水利枢纽对江湖洪期水动力过程的影响[J].长江科学院院报,2024,41(3):9-15,7.基金项目
国家自然科学基金项目(11972265) (11972265)
中国水利水电科学研究院水利部泥沙科学与北方河流治理重点实验室开放研究基金项目(IWHR-SEDI-2022-04) (IWHR-SEDI-2022-04)
中央级公益性科研院所基本科研业务费项目(CKSF2021530/HL) (CKSF2021530/HL)