连续钢箱梁桥顶推施工下导梁设计参数分析

孙建民

科技创新与应用2024,Vol.14Issue(7):119-122,4.
科技创新与应用2024,Vol.14Issue(7):119-122,4.DOI:10.19981/j.CN23-1581/G3.2024.07.027

连续钢箱梁桥顶推施工下导梁设计参数分析

孙建民1

作者信息

  • 1. 中铁二十二局集团第二工程有限公司,北京 100041
  • 折叠

摘要

Abstract

In bridge engineering,setting guide beams during jacking construction can reduce the number of temporary piers and increase the span between temporary piers.However,at present,the design of the guide beam has not yet formed a complete theoretical system,and the design of the guide beam according to the steel structure design method is more complex.According to an engineering example and based on the calculation of finite element software,this paper calculates the stress of the structure under different guide beam lengths and different variable cross-section schemes,and takes the stress,deflection and stability of the structure under the most unfavorable conditions as the basis for evaluation.Finally,the variable cross-section scheme of 36 m guide beam length,proximal 2 500 mm and distal 1 500 mm is selected,which saves 7.27%of steel consumption.Finally,the maximum vertical deflection of steel guide beam is 314.6 mm,the maximum normal stress of steel guide beam is 164.4 MPa,and the maximum shear stress of steel guide beam is 32.1 MPa,which all meet the requirements of the code.

关键词

顶推施工/变截面导梁/数值模拟/参数优化/工程实例

Key words

jacking construction/variable cross-section guide beam/numerical simulation/parameter optimization/engineering example

分类

交通工程

引用本文复制引用

孙建民..连续钢箱梁桥顶推施工下导梁设计参数分析[J].科技创新与应用,2024,14(7):119-122,4.