Performance of the suspension method in large cross-section shallow-buried tunnels
Performance of the suspension method in large cross-section shallow-buried tunnels
摘要
关键词
Subway tunnel construction/Suspension method/Settlement control/Numerical analysis/On-site monitoringKey words
Subway tunnel construction/Suspension method/Settlement control/Numerical analysis/On-site monitoring引用本文复制引用
Guoqing Cai,Xinxiang Zou,Qiang Zhang,Rui Yang,Tianchi Wu,Jiguang Li..Performance of the suspension method in large cross-section shallow-buried tunnels[J].高速铁路(英文),2023,1(4):224-232,9.基金项目
This work was supported by the Fundamental Research Funds for the Central Universities(2023JBZD004),the National Natural Science Foundation of China(U2034204,52078031),and the Science and Technology Development Project of CCCC Harbin Metro Investment and Construction Co.,Ltd.(ZJHD-FW-2018-01-086). (2023JBZD004)