| 注册
首页|期刊导航|港口航道与近海工程|中间法三角高程测量代替水准测量的可行性分析

中间法三角高程测量代替水准测量的可行性分析

雷力军 王志文

港口航道与近海工程2024,Vol.61Issue(1):104-108,5.
港口航道与近海工程2024,Vol.61Issue(1):104-108,5.DOI:10.16403/j.cnki.ggjs20240120

中间法三角高程测量代替水准测量的可行性分析

Feasibility of Intermediate Triangulated Height Survey Replacing Water Leveling

雷力军 1王志文1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

Abstract

A detailed and systematic introduction to intermediate triangulated height survey contains the law and correction of errors analyzed and deducted with formula,which demonstrates the feasibility of triangulated height survey replacing fourth-class leveling.In addition to that,specific projects verify the above assumption.New method can effectively supplement the data with the same height precision covering the area where the fourth-class leveling cannot apply.Furthermore,its operation in convenience and high efficiency can meet the needs of daily survey.

关键词

三角高程测量/水准测量/精度分析/全站仪

Key words

triangulated height survey/water leveling/precision analysis/total station

分类

天文与地球科学

引用本文复制引用

雷力军,王志文..中间法三角高程测量代替水准测量的可行性分析[J].港口航道与近海工程,2024,61(1):104-108,5.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文