红水河2024,Vol.43Issue(1):54-60,7.DOI:10.3969/j.issn.1001-408X.2024.01.011
岩滩水电站扩建工程尾水检修闸门室施工组织设计优化
Construction Organization Design Optimization on Tailrace Bulkhead Gate Chamber in Extension Project of Yantan Hydropower Station
张焱光1
作者信息
- 1. 中国能源建设集团广西水电工程局有限公司, 广西 南宁 530001
- 折叠
摘要
Abstract
In view of the problems of construction content and construction difficulty caused by the lag of tailrace tunnel intersection time,ultra-high and ultra-deep gate chamber,narrow space and poor geological conditions in the construction of tailrace bulkhead gate chamber of No.5 and No.6 units of Yantan Hydropower Station extension project,the author expounds the construction organization design optimization from the aspects of gate chamber excavation support,concrete construction and gate installation.By changing the gate chamber excavation scheme and concrete construction method,careful planning and scientific arrangement,high-quality and efficient construction is realized,and the construction is completed according to the contract period.关键词
尾水检修闸门/闸门廊道/闸门井/混凝土施工/施工组织设计/岩滩水电站扩建工程Key words
tailrace bulkhead gate/gate gallery/gate shaft/concrete construction/construction organization design/extension project of Yantan Hydropower Station分类
建筑与水利引用本文复制引用
张焱光..岩滩水电站扩建工程尾水检修闸门室施工组织设计优化[J].红水河,2024,43(1):54-60,7.