|国家科技期刊平台
首页|期刊导航|人民珠江|兼顾本地与直流受端电网调峰需求的水电站群短期优化调度模型

兼顾本地与直流受端电网调峰需求的水电站群短期优化调度模型OA

Short-term Optimal Scheduling Model for Hydropower Stations Considering Peak Shaving of Local and HVDC Receiving Power Grids

中文摘要英文摘要

面对巨型水电站群高压直流送端电网和受端电网日益严峻的调峰压力,建立了一种兼顾本地与直流受端电网调峰需求的梯级水电站群短期优化调度模型.模型以多电网剩余负荷最大值最小为目标,考虑常规梯级水电站群水力、电力约束,以及复杂高压直流输电线路运行约束,并引入直流线路与水电站之间耦合运行约束.在模型求解阶段,引入辅助变量将目标函数、水电运行约束、直流运行约束线性化,并采用大M法对直流线路与水电站之间双向区间耦合约束进行线性化,将原模型转换为混合整数线性规划模型.以中国西南地区某巨型水电站群冬季和夏季典型日为实例研究,结果表明:送端电网负荷峰谷差降幅高达 100%,受端电网负荷峰谷差降幅分别达28.1%和31.6%.所提模型能够利用高压直流输电线路共享水电灵活性,有效实现多电网调峰,并保证直流输电线路运行在安全区间,可以为巨型梯级水电站群短期多电网调峰提供参考和借鉴.

In the face of the increasingly severe peak shaving pressure on both sending and receiving power grids of the high voltage direct current(HVDC)of large-scale hydropower stations,a short-term optimal scheduling model that takes into account peak shaving of local and HVDC receiving power grids of the cascade hydropower stations has been established.The model aims to minimize the maximum value of residual load in multiple power grids,not only considering the conventional hydraulic and power constraints of the cascade hydropower stations and the complex operation constraints of the HVDC transmission lines but also introducing coupled operation constraints between the HVDC transmission line and the hydropower stations.In the model-solving phase,the original model is transformed into a mixed-integer linear programming model by introducing auxiliary variables to linearize the objective function,hydraulic operation constraints,and HVDC operation constraints and using the big M method to linearize the bi-directional interval coupled constraints between the HVDC transmission line and the hydropower stations.Typical winter and summer days in a large-scale hydropower system in southwestern China are taken as examples,and the results show that the peak-valley difference of the sending power grid has decreased by up to 100%,while the decrease in the peak-valley difference in the receiving end power grid is 28.1%and 31.6%,respectively.It shows that the proposed model can share the flexibility of hydropower through HVDC transmission lines,achieve peak shaving in multiple power grids,and ensure safe operation of the HVDC transmission lines,which can provide a reference for short-term multi-grid peak shaving of large-scale cascade hydropower stations.

周彬彬;张聪通;刘本希;程春田;陈凯;王有香

云南电力调度控制中心,云南 昆明 650000大连理工大学,辽宁 大连 116000

水利科学

水电站群多电网调峰短期优化调度高压直流输电混合整数线性规划

hydropower stationsmulti-grid peak shavingshort-term optimal schedulinghigh-voltage direct current transmissionmixed-integer linear programming

《人民珠江》 2024 (003)

120-130,145 / 12

国家自然科学基金重点项目(52039002)

10.3969/j.issn.1001-9235.2024.03.013

评论