| 注册
首页|期刊导航|水力发电学报|床沙级配调整对黄河下游洪水演进的影响

床沙级配调整对黄河下游洪水演进的影响

张晓雷 徐志恒 杨晨 毕峥峥

水力发电学报2024,Vol.43Issue(3):14-23,10.
水力发电学报2024,Vol.43Issue(3):14-23,10.DOI:10.11660/slfdxb.20240302

床沙级配调整对黄河下游洪水演进的影响

Effects of bed sand gradation adjustment on flood routing in lower Yellow River mainstream

张晓雷 1徐志恒 2杨晨 3毕峥峥2

作者信息

  • 1. 华北水利水电大学 水利学院,郑州 450046||水利部黄河流域水治理与水安全重点实验室(筹),郑州 450003||河南省水圈与流域水安全重点实验室,郑州 450046
  • 2. 华北水利水电大学 水利学院,郑州 450046
  • 3. 河南省水圈与流域水安全重点实验室,郑州 450046||华北水利水电大学 黄河流域水资源高效利用省部共建协同创新中心,郑州 450046
  • 折叠

摘要

Abstract

Since the operation of Xiaolangdi Reservoir,significant changes have occurred in the conditions of water and sediment entering the lower Yellow mainstream.Due to the impact of clear water discharge from the reservoir,noticeable bed sediment coarsening has occurred downstream of the reservoir.To investigate the impact of bed sediment gradation adjustment on flood routing in this mainstream section,this study first develops a one-dimensional water-sediment coupling mathematical model suitable for the section.And the model is validated using the observed floods occurring from Apr.to Oct.2020 in the reach of Huayuankou to Sunkou.Then,we design four sets of bed sediment gradations as the initial bed sediment conditions for numerical simulations,based on bed sediment coarsening characteristics over this reach,and taking bed sediment coarsening at Huayuankou as a representative process.Finally,the validated model is used for simulations and the impact of bed sediment gradation adjustment on flood routing is examined.The simulations show the adjustment has an influence on the discharge,water level,sediment concentration,flood routing time,and scour and deposition in the lower Yellow mainstream.Generally,the influence on the river discharge is relatively small,while more sensitive are the responses of water level,sediment concentration,flood routing time,and scour and deposition to the changes in bed sediment gradation.We predict that when the median diameter(d50)of bed sediment increases from 0.076 mm(Gradation 1)to 0.242 mm(Gradation 4),water level at the Jiahetan cross-section will rise by 0.89 m,and scour and deposition in the Huayuankou-Sunkou reach will change from a scour volume of 67.9 million m3 to a deposition volume of 5.9 million m3,indicating a reduction of 109%in the scour rate.The findings of this study help manage the lower Yellow River channel under new water-sediment conditions.

关键词

一维水沙耦合模型/床沙粗化/洪水演进/冲淤变化/黄河下游

Key words

1D water-sediment coupling model/bed sand coarsening/flood routing/scour and deposition change/lower Yellow River

分类

水利科学

引用本文复制引用

张晓雷,徐志恒,杨晨,毕峥峥..床沙级配调整对黄河下游洪水演进的影响[J].水力发电学报,2024,43(3):14-23,10.

基金项目

国家重点研发计划(2021YFC3200402) (2021YFC3200402)

国家自然科学基金(U2243220) (U2243220)

水利部黄河流域水治理与水安全重点实验室(筹)研究基金(2022-SYSJJ-10) (筹)

水力发电学报

OA北大核心CSTPCD

1003-1243

访问量0
|
下载量0
段落导航相关论文