| 注册
首页|期刊导航|河北水利电力学院学报|布桑加水电站坝址探洞地震波CT应用研究

布桑加水电站坝址探洞地震波CT应用研究

刘晟 王杰 刘康和 阎建维

河北水利电力学院学报2024,Vol.34Issue(1):34-38,5.
河北水利电力学院学报2024,Vol.34Issue(1):34-38,5.DOI:10.16046/j.cnki.issn2096-5680.2024.01.006

布桑加水电站坝址探洞地震波CT应用研究

Application Study on Seismic Wave CT between Adits at the Dam Site of Busanga Hydropower Station

刘晟 1王杰 1刘康和 1阎建维2

作者信息

  • 1. 中水北方勘测设计研究有限责任公司 科学技术研究院,天津市河西区洞庭路60号 300222
  • 2. 黄河万家寨水利枢纽有限公司 电站管理局,山西省太原市杏花岭区府东街89号 030002
  • 折叠

摘要

Abstract

In order to meet the basic requirements of the geological conditions of the concrete double-curved arch dam of the Busanga hydropower station(the dam bedrock mass is required to be intact and uni-form,high strength,and simple geological structure),it is necessary to study the quality of the foundation rock mass in the dam site area and explore geological defects inside the rock mass.The seismic wave com-puterized tomography(CT)test of the rock mass between the excavated aditsintwo abutments of the dam site is carried out,and the wave velocity distribution law of the engineering rock mass in the test area is obtained.According to the variation characteristics of seismic wave CT imaging wave velocity distribution,the structural characteristics of the rock mass in the dam site,the spatial distribution of geological defects such as the quality of the rock mass,the geological structure and the weak rock zone are determined,and the basic geological conditions of the engineering rock mass in the dam site area are revealed,and the good application effect is obtained.The purpose of investigation is achieved,which provides reliable basic data for dam engineering design.

关键词

水电站/基础岩体质量/探洞/地震波CT技术/成果分析

Key words

hydropower station/quality of foundation rock mass/adit/seismic wave CT technology/re-sult analysis

分类

建筑与水利

引用本文复制引用

刘晟,王杰,刘康和,阎建维..布桑加水电站坝址探洞地震波CT应用研究[J].河北水利电力学院学报,2024,34(1):34-38,5.

基金项目

国家服务业引导基金项目(2018-120103-74-03-129388) (2018-120103-74-03-129388)