关于将斜拉坝技术运用于淤地坝建设的设想OA
Assumption on Applying Technology of Cable-stayed Dam to the Construction of Silt Dam
均质土填筑的淤地坝易发生连锁溃坝,文中提出了将斜拉坝技术运用于淤地坝建设的设想,并与闸坝和液压升降坝 2 种方式进行了对比.在大厚度黄土地区修建斜拉坝,其主要技术难点是坝前拉索的锚固问题,对此开发设计了适用于深覆盖层上建设斜拉坝的抗拔基础结构.并对斜拉坝的防渗、泄洪等方式进行了探讨.
Silt dams filled with homogeneous soil are prone to chain dam failure.The assumption of applying technology of cable-stayed dam to the construction of silting dam is put forward.The characteris-tics of the proposed technical scheme are compared with those of gate dam and hydraulic lifting dam.The anchorage of the cable in front of the dam is the main technical difficulty in the construction of cable-stayed dam in loess areas with large thickness.The methods of seepage prevention and flood discharge of cable-stayed dams are also discussed.It is of great significance to popularize new technology and new dam type cable-stayed dam.
辛振科
甘肃省水利水电勘测设计研究院有限责任公司 工程设计二院,甘肃省兰州市城关区平凉路284号 730000||水利部兰州勘测设计研究院,甘肃省兰州市城关区鱼儿沟18号 730020
农业科学
斜拉坝淤地坝抗拔基础
cable-stayed damsilt dampull-out base
《河北水利电力学院学报》 2024 (1)
39-42,4
甘肃省水利科学试验研究与技术推广计划项目(23GSLK067)
评论