基于结构方程模型的公轨合建桥施工安全风险评估OA

Safety Risk Assessment of Highway and Rail Traffic Building Jointly Bridge Based on Structural Equation Model

中文摘要英文摘要

依托新建西安公轨合建10号线一期工程跨越泾渭河段与西阎快速路公铁两用桥项目,采用WBS-RBS法识别施工风险源;利用耦合度模型对风险因素进行了单、双风险耦合度计算;通过文献调研将公轨合建项目风险划分为人员素质、机材状态和作业环境等7大类,共24小类,并利用结构方程模型对施工风险模型进行了验证.耦合性分析结果表明,人员风险因素和机械设备材料风险因素最易与其他风险因素发生耦合.结构方程模型结果表明,施工风险因素按照相关系数由大到小排序为:安全执行力>…查看全部>>

Based on the construction of the first Phase of the line 10 project of Xi'an highway and rail traffic building jointly,which crosses the Jingwei River section and dual-use bridge project of the Xiyan Expressway,the WBS-RBS method was used to identify construction risk sources;The coupling degree model was used to calculate the single and double risk coupling degrees of risk factors;Through literature research,the risks of public rail joint construction proje…查看全部>>

何畅;李文华

西南交通大学土木工程学院,四川成都 610031中交第一公路勘察设计研究院有限公司,陕西西安 710075

交通运输

结构方程模型公轨合建施工安全风险评估风险耦合

structural equation modelinghighway and rail traffic building jointlyconstruction safety risk assess-mentrisk coupling

《市政技术》 2024 (3)

51-56,71,7

中交第一公路勘察设计研究院有限公司科研项目(KYL202203-0088)

10.19922/j.1009-7767.2024.03.051