After the collapse of K2+240 section of Yongchang Highway,the roadbed,pavement,and mountains sank as a whole,causing traffic interruption.The reason for collapse is that under the influence of reservoir water storage,the strength of rock and soil in the lower slope of highway decreases,causing the stability of slope to be destroyed.During the continuous decline of reservoir water level,due to the poor permeability of clay,schist,and other materials in the slope,the groundwater in the slope cannot be discharged in a timely manner,and the deformation of slope further develops.Based on the causes of slope collapse,a design proposal is proposed to use anti slip piles and retaining plates for support,and the implementation effect is significant.关键词
滑塌/稳定计算/抗滑桩/排水Key words
collapse/stability calculation/anti-slide pile/drainage分类