水库主坝浇筑加固下大体积混凝土防裂温控应用
Application of Temperature Control for Crack Prevention of Large Volume Concrete under the Pouring and Reinforcement of Reservoir Main Dam
温浩1
作者信息
- 1. 深圳市广汇源水利建筑工程有限公司,广东 深圳 518000
- 折叠
摘要
Abstract
During the large volume pouring process of dam concrete,due to the heat release from cement hydration,an uneven temperature gradient stress field is easily formed inside the concrete,which increases the risk of concrete cracking.This paper takes the main dam reinforcement project of Chiao Reservoir as the research background,and proposes a cooling water circulation system for temperature control and crack prevention in the construction of large volume concrete pouring.A temperature field function measurement and control system combined with a large volume concrete cooling and temperature measurement integrated system achieves the goal of precision and safety guidance for temperature control construction.关键词
大体积浇筑/温控防裂/冷却水循环系统Key words
large volume pouring/temperature control and crack prevention/cooling water circulation system分类
建筑与水利引用本文复制引用