北堤新建防洪调蓄泵闸建设施工技术研究

林佳蓉 吴创涛

云南水力发电2024,Vol.40Issue(3):87-90,4.
云南水力发电2024,Vol.40Issue(3):87-90,4.DOI:10.3969/j.issn.1006-3951.2024.03.023

北堤新建防洪调蓄泵闸建设施工技术研究

Research on Construction Technology of New Flood Control and Storage Pump Sluice on North Embankment

林佳蓉 1吴创涛1

作者信息

  • 1. 惠州大堤北堤管理中心,广东 惠州 516000
  • 折叠

摘要

Abstract

Huibo Avenue section of North Embankment has a high drainage pressure,leading to frequent flooding in the vicinity,and there is an urgent need to build a new pumping station.The construction of the pumping station project in this area requires strong technical requirements,a short construction period,and a narrow construction site.In order to ensure construction progress and quality,the construction procedure of the pumping station project should be reasonably planned,with a focus on controlling earthwork,foundation treatment,and concrete construction technology.These measures have achieved good construction results,solved the key and difficult points of construction,ensured the construction period and quality,and successfully reduced construction energy consumption.

关键词

水利建设/泵站工程/施工难点/关键技术

Key words

water conservancy construction/pump station engineering/construction difficulties/key technology