| 注册
首页|期刊导航|云南水力发电|郑屋脚堤防工程防洪墙加固方案比选分析

郑屋脚堤防工程防洪墙加固方案比选分析

赖宇宁

云南水力发电2024,Vol.40Issue(3):119-121,3.
云南水力发电2024,Vol.40Issue(3):119-121,3.DOI:10.3969/j.issn.1006-3951.2024.03.030

郑屋脚堤防工程防洪墙加固方案比选分析

Comparison and Analysis of Reinforcement Plans for Flood Control Walls in Zhengwujiao Embankment Project

赖宇宁1

作者信息

  • 1. 梅州市梅江区水务服务中心,广东 梅州 514000
  • 折叠

摘要

Abstract

Zhengwujiao Embankment Project is an emergency rescue project located in Jiaying New Area,involving the Zhengwujiao to Putian section,at the intersection of Baigong River and Meijiang River.The specific location of Baigong River is in Xiyang Town,Meijiang District.The construction scope of this project includes the downstream right bank of Meijiang Xiyang Power Station and the left bank of Baigong River outlet,mainly including projects such as Xiyang Embankment(Puwei section)and Xiyang Embankment(Weizhen section).However,quality issues and cracks were found in the safety assessment of the collapse risk area and other parts of the flood control wall,so reinforcement measures are needed.By analyzing key elements such as collapse risk areas,flood wall height,crack conditions,and design standards,a comparative analysis of reinforcement schemes was proposed.It focuses on the feasibility of engineering quality,safety appraisal results,and reinforcement plans.By comparing and evaluating different reinforcement schemes,the most suitable scheme was selected to ensure the stability and safety of the flood control wall.

关键词

郑屋脚/堤防工程/防火墙/加固方案/比选分析

Key words

Zhengwujiao/embankment project/firewall/reinforcement plan/comparison and analysis

分类

建筑与水利

引用本文复制引用

赖宇宁..郑屋脚堤防工程防洪墙加固方案比选分析[J].云南水力发电,2024,40(3):119-121,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文