云南水力发电2024,Vol.40Issue(3):122-125,134,5.DOI:10.3969/j.issn.1006-3951.2024.03.031
清远市清新区滨江河浸潭段碧道工程护岸挡墙比选研究
Comparative Study on the Selection of Retaining Walls for the Embankment of Binjiang River Jintan Section Green Route Project in Qingxin District
董志鹏1
作者信息
- 1. 清远市清新区城区防汛工程管理所,广东 清远 511500
- 折叠
摘要
Abstract
This paper conducts a comparative study on the design of retaining walls for the embankment of Binjiang River Jintan Section Green Route Project in Qingxin District,Qingyuan City.By comprehensively considering factors such as erosion resistance,economy,and ecological effects,four revetment schemes were compared:masonry retaining walls,ecological gabion retaining walls,ecological block retaining walls,and throwing stone retaining walls.The ecological block retaining wall and turf slope protection scheme was ultimately selected as the optimal design scheme,and specific design and construction points were discussed.This scheme has strong anti erosion performance,low comprehensive cost,and good ecological effect,which can achieve engineering goals and improve the ecological environment and landscape effect of the riverbank.关键词
碧道工程/护岸挡墙/挡墙比选/生态环境Key words
green route project/revetment retaining wall/comparison of retaining wall/ecological environment分类
建筑与水利引用本文复制引用
董志鹏..清远市清新区滨江河浸潭段碧道工程护岸挡墙比选研究[J].云南水力发电,2024,40(3):122-125,134,5.