Abstract

This paper conducts a scheme study on the widening project of the Shiyan River flood control channel.Through the analysis of the current situation and problems of the river,it proposes two options:widening towards the left bank and widening towards the right bank.Through comparative analysis,a widening plan towards the left bank was selected and a specific plan design was carried out.Meanwhile,this paper discusses issues related to demolition and land acquisition,upstream and downstream connections,and relocation of high-voltage power lines.Finally,it highlights the importance of construction planning and management,and emphasizes quality control,safety management,and other considerations.

关键词

石岩河/防洪/河道拓宽

Key words

Shiyan River/flood control/river widening

分类

建筑与水利

引用本文复制引用

洪树星..防洪河道拓宽工程方案对比研究[J].云南水力发电,2024,40(3):126-129,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文