云南水力发电2024,Vol.40Issue(3):155-158,4.DOI:10.3969/j.issn.1006-3951.2024.03.039
安溪县主要灌区节水改造综合整治工程建设紧迫性评估
Urgency Assessment of the Construction of Water-saving Comprehensive Renovation Project in Anxi County
王晓阳1
作者信息
- 1. 安溪县村内水库水资源调配中心,福建 泉州 362400
- 折叠
摘要
Abstract
Combined with the situation of the main watershed irrigation areas in Anxi County,the evaluation system of water-saving reconstruction and comprehensive improvement project is constructed.The system includes five primary indicators and twelve secondary indicators.Based on the forward and dimensionless processing of the basic data,the urgency evaluation results of the engineering construction of each irrigation area are obtained in combination with the specific level standards.There are obvious problems in the irrigation area of Yiduxi River Basin,so it is necessary to carry out the comprehensive renovation project of water-saving reconstruction immediately.The irrigation problems in Lanxi and Longtan River basins are serious,and the construction of water-saving reconstruction and comprehensive treatment project is highly urgent.The severity of irrigation problems in Fuqianxi river basin is general,and it is necessary to improve the secondary indicators under urgent circumstances.关键词
主要灌区/节水改造/评估指标/紧迫性Key words
main irrigation area/water-saving reform/evaluation indicator/urgency分类
农业科技引用本文复制引用
王晓阳..安溪县主要灌区节水改造综合整治工程建设紧迫性评估[J].云南水力发电,2024,40(3):155-158,4.