云南水力发电2024,Vol.40Issue(3):159-162,4.DOI:10.3969/j.issn.1006-3951.2024.03.040
广东某城镇街道污水零直排下的雨污改造管网升级实践
Practice of Upgrading the Rainwater and Sewage Renovation Pipeline Network under Zero Direct Discharge of Sewage in a Certain Town Street in Guangdong Province
刘永忠1
作者信息
- 1. 深圳市光明区环境水务有限公司新光分公司,广东 深圳 518107
- 折叠
摘要
Abstract
In order to improve the quality of water environment,achieve zero direct discharge of sewage,and fundamentally solve the problem of water environmental pollution,taking a street in Guangdong as an example,the natural environment and construction conditions of the area are analyzed.Based on the current situation of water pollution and pipe network drainage system,a pipe network upgrade plan is proposed.By dredging and repairing the old pipe network,reconstructing the intercepting sewage pipe,and reforming the rain sewage confluence and mixed drainage pipe network,the adaptability of various schemes is evaluated.It is expected to achieve good ecological environment and economic benefits.关键词
污水零直排/管网升级/广东地区/效益评估Key words
zero direct discharge of sewage/pipeline network upgrade/Guangdong/benefit evaluation分类
建筑与水利引用本文复制引用
刘永忠..广东某城镇街道污水零直排下的雨污改造管网升级实践[J].云南水力发电,2024,40(3):159-162,4.