Based on the practice of erecting 25-meter-long precast T-beams of a 210-meter small radius curved bridge in an expressway,this paper compares the two methods of track shifting and temporary pier erection of double-guide beams in small-radius bridges,and analyzes the feasibility of erecting double-guide beam bridge erection machines in long-span and small-radius curved bridges.This paper mainly introduces the construction technology of bridge erecting machine,such as assembling,forward moving,beam feeding,T beam installation,through-hole steering of bridge erecting machine,etc.关键词
桥梁工程/架桥机/小半径/曲线桥/T梁/架设/施工技术Key words
bridge engineering/bridge erection machine/small radius/curved bridge/T beam/erection/construction technology分类