| 注册
首页|期刊导航|科技创新与应用|隧道光面爆破施工技术要点分析

隧道光面爆破施工技术要点分析

张宝林

科技创新与应用2024,Vol.14Issue(10):189-192,4.
科技创新与应用2024,Vol.14Issue(10):189-192,4.DOI:10.19981/j.CN23-1581/G3.2024.10.046

隧道光面爆破施工技术要点分析

张宝林1

作者信息

  • 1. 中铁十四局集团第二工程有限公司,山东 泰安 271000
  • 折叠

摘要

Abstract

As an effective blasting control technology,smooth blasting technology is very important for construction quality,over-underexcavation and cost control,but geological conditions such as groundwater and rockburst are often encountered in mountain tunnels,which brings inconvenience to smooth blasting construction.In view of this situation,this paper takes the hot spring tunnel as the background,discusses the blasting principle,the parameter design of smooth blasting and the effect after smooth blasting,and obtains the reasonable construction design parameters.Finally,this paper puts forward the reasonable construction control technology on this basis,so as to provide reference and optimization assistance and basis for follow-up tunnel drilling and blasting design.

关键词

光面爆破/山岭隧道/爆破设计/爆破效果/控制技术

Key words

smooth blasting/mountain tunnel/blasting design/blasting effect/control technology

分类

交通工程

引用本文复制引用

张宝林..隧道光面爆破施工技术要点分析[J].科技创新与应用,2024,14(10):189-192,4.

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文