| 注册
首页|期刊导航|中国资源综合利用|矿业建设工程地质灾害危险性现状评估及防治研究

矿业建设工程地质灾害危险性现状评估及防治研究

贺文强

中国资源综合利用2024,Vol.42Issue(3):143-146,4.
中国资源综合利用2024,Vol.42Issue(3):143-146,4.DOI:10.3969/j.issn.1008-9500.2024.03.037

矿业建设工程地质灾害危险性现状评估及防治研究

Research on the Current Risk Assessment and Prevention of Geological Hazards in Mining Construction Engineering

贺文强1

作者信息

  • 1. 中国建筑材料工业地质勘查中心青海总队,西宁 100035
  • 折叠

摘要

Abstract

The temporary land(lease)construction project for Dazaohuo Xinanshan serpentine rock ore and tremolite jade ore mining and selection projects is located in Golmud Town,Geermu City,and conducting a geological hazard risk assessment for the construction project can provide important basis for the later safety construction of the project.The evaluation results indicate that the geological hazards in the explosive storage and 1#living area are unstable slopes(Q)and debris flows(N).Among them,the unstable slopes(numbered Q1 and Q2)have a moderate degree of development,moderate degree of harm,and moderate risk in the current assessment.The development level of debris flow(N1)is moderate,the degree of harm is moderate,and the current assessment of the danger is moderate.The geological hazard type in the 2#living area is unstable slope,with moderate development and harm level of unstable slope(Q3),and the current assessment shows moderate risk.Reasonable drainage and effective support measures can be adopted in the later stage to ensure the stability of the slope.

关键词

矿业建设工程/地质灾害/危险性现状评估/防治

Key words

mining construction engineering/geological hazards/current risk assessment/prevention

分类

矿业与冶金

引用本文复制引用

贺文强..矿业建设工程地质灾害危险性现状评估及防治研究[J].中国资源综合利用,2024,42(3):143-146,4.

中国资源综合利用

OACHSSCD

1008-9500

访问量0
|
下载量0
段落导航相关论文