|国家科技期刊平台
首页|期刊导航|江苏水利|堤防加固工程中土方填筑施工技术要点控制

堤防加固工程中土方填筑施工技术要点控制OA

Control of key technical points of earthwork filling construction in embankment reinforcement project

中文摘要英文摘要

通过对中小河流治理堤防加固项目中,加强土方填筑技术管控的总结分析,结果表明,河道堤防加固中土方填筑施工技术管理尤为重要,要认真做好碾压试验,并综合研判,科学确定指标参数,打好基础技术工作;要从专业角度对待土料选择,紧盯土源质量;要用技术的、经济的、管理的系统方法论,统筹组织好现场机械施工.唯此能保证土方填筑施工工程质量、效益、安全相统一.

Through the summary and analysis of strengthening the control of earthwork filling technology in the reinforcement project of small and medium-sized river embankments,the results show that the management of earthwork filling construction technology in river embankment reinforcement is particularly important.It is necessary to carefully carry out compaction tests,comprehensively analyze and judge,scientifically determine indicator parameters,and lay a solid foundation for technical work;It is necessary to treat the selection of soil materials from a professional point of view and keep a close eye on the quality of soil sources;We need to use the systematic methodology of technology,economy and management to coordinate and organize the on-site mechanical construction.This is the only way to ensure that the quality,efficiency and safety of earth filling construction projects are harmonized.

曹驰宇

江苏力恒工程咨询有限公司,江苏南京 210000||南京市水利规划设计院股份有限公司,江苏南京 210000

水利科学

河道堤防加固工程技术管理土方填筑碾压试验

river embankment reinforcement projecttechnical managementearthwork fillingcompaction test

《江苏水利》 2024 (004)

41-45 / 5

评论