闸站枢纽泵站前池流态及其改善数值模拟研究

王铁力 赵文军 许潘东 陈武 仇宝云 黄先北

江苏水利Issue(4):1-4,20,5.
江苏水利Issue(4):1-4,20,5.

闸站枢纽泵站前池流态及其改善数值模拟研究

Numerical simulation study of flow pattern and improvement in front pool of sluice-pumping station

王铁力 1赵文军 2许潘东 3陈武 2仇宝云 4黄先北4

作者信息

  • 1. 江苏省水利勘测设计研究院有限公司,江苏扬州 225127
  • 2. 江苏省骆运水利工程管理处,江苏宿迁 221200
  • 3. 泗洪县机电排灌管理总站,江苏宿迁 221200
  • 4. 扬州大学电气与能源动力工程学院,江苏扬州 225127
  • 折叠

摘要

Abstract

This paper analyzed the causes of sediment deposition in the front pool of Shaji Sluice Station,and tried to rebuild the new cleaning machine bridge in the downstream.The bridge piers were used to improve the flow pattern of the front pool and reduce sediment deposition.The three-dimensional modeling software UG NX was used to establish a three-dimensional model of the river flow field,and ICEM CFD was used for computational domain mesh division.ANSYS CFX was used for numerical calculation.The calculation results indicate that under the current pumping conditions,there is a large-scale low-speed zone on the inner side of the diversion wall,resulting in large-scale sediment deposition.Extend the diversion walls on both sides downstream of the pump station to 60 meters,build a new cleaning machine bridge at the head of the diversion wall,and use bridge piers for diversion.The low-speed sedimentation area on the inner side of the diversion wall is greatly reduced,and the inflow flow pattern of the pump station is greatly improved.

关键词

闸站枢纽/前池流态/清污机桥/桥墩导流/流态改善/数值试验

Key words

sluice station hub/front pool flow pattern/cleaning machine bridge/pier diversion/flow pattern improvement/numerical experiments

分类

建筑与水利

引用本文复制引用

王铁力,赵文军,许潘东,陈武,仇宝云,黄先北..闸站枢纽泵站前池流态及其改善数值模拟研究[J].江苏水利,2024,(4):1-4,20,5.

基金项目

国家自然科学基金(52179091)、江苏省水利科技项目(2022016) (52179091)

江苏水利

1007-7839

访问量5
|
下载量0
段落导航相关论文