山东煤炭科技2024,Vol.42Issue(3):10-15,6.DOI:10.3969/j.issn.1005-2801.2024.03.003
岩巷段巷道三岔口联合支护技术研究
Research on Combined Support Technology for Roadway Three Forks in Rock Roadway Section
张磊 1李方见1
作者信息
- 1. 河南能源集团永煤集团陈四楼煤矿,河南 永城 476600
- 折叠
摘要
Abstract
In view of the complex stress and instability of the three fork roadway in the 2902 lower crossheading rock roadway section of Chensilou Coal Mine,a combined support way of"anchor rod+anchor cable+metal mesh+spray grouting support"is determined through force analysis of the triangular area of roadway three forks.The overall stability of the roadway surrounding rock is greatly improved,the subsidence amount of the roof is controlled below 0.07 m,and the convergence amount of the two sides is controlled below 0.06 m.关键词
三岔/岩巷/联合支护Key words
trifurcation/rock roadway/combined support分类
矿业与冶金引用本文复制引用
张磊,李方见..岩巷段巷道三岔口联合支护技术研究[J].山东煤炭科技,2024,42(3):10-15,6.