Zinc and cadmium were recovered by acid leaching-vulcanization impurity removal method from dust of slide blowing-fuming process for treating jarosites,and copper was selectively removed from the leaching solution by sulfide precipitation.Subsequently,the obtained purified solution will be used to prepare Cd-doped ZnS composites.Based on the thermodynamic analysis,the influencing factors and kinetics of zinc leaching rate in sulfuric acid system were investigated,and the influence of various parameters on sulfidation was elucidated through orthogonal tests.The results show that the zinc in dust mainly exists in the form of zinc oxide,the leaching reaction follows a mixed control model with a 73.70 kJ/mol activation energy.Zinc leaching rate can reach 98.99%under the optimum conditions.The copper removal rate can reach 95.97%under 3.2 theoretical times of Na2S addition at pH of 2.0,with high retaining rate of Zn and Cd,achieving effectively selective separation of copper from zinc and cadmium.

关键词

烟灰/硫酸/浸出////选择性分离

Key words

dust/sulfuric acid/leaching/copper/zinc/cadmium/selective separation

分类

矿业与冶金

引用本文复制引用

张佳桦,崔雅茹,王国华,王正民,桂海平,李邓,李安鑫..从铁矾渣侧吹熔炼—烟化法烟灰中回收锌镉及其净化除杂[J].湿法冶金,2024,43(2):121-128,8.

基金项目

陕西省科技厅重点研发计划(2022GY-160). (2022GY-160)

湿法冶金

OA北大核心

1009-2617

访问量3
|
下载量0
段落导航相关论文