云南水力发电2024,Vol.40Issue(4):1-3,3.DOI:10.3969/j.issn.1006-3951.2024.04.001
新疆戈壁滩风力发电场微观选址及风电机组选型设计
Wind Turbine Selection Design and Micro Site Selection of Gobi Desert Wind Power Plant in Xinjiang
罗晓刚1
作者信息
- 1. 中国电建集团西北勘测设计研究院有限公司,陕西 西安 710000
- 折叠
摘要
Abstract
With the implementation of China's national strategic policy of"carbon peaking and carbon neutrality",the supply of clean and low-carbon energy has become a theme of economic and social development.The reform of building a new type of renewable energy system is rapidly advancing.It can effectively develop and utilize Gobi Desert area in Xinjiang,and build wind power stations to supply the scarce electricity in the mainland.For the micro site selection and wind turbine selection of power plants in Gobi Desert of Xinjiang,this paper takes the Milan 200 MW wind power plant project of the 36th Regiment of the Xinjiang Production and Construction Corps Second Division as an example to carry out a systematic scheme design..关键词
戈壁滩/风力发电场/微观选址/风机选型Key words
Gobi Desert/wind power plant/micro site selection/wind turbine selection分类
动力与电气工程引用本文复制引用
罗晓刚..新疆戈壁滩风力发电场微观选址及风电机组选型设计[J].云南水力发电,2024,40(4):1-3,3.