| 注册
首页|期刊导航|云南水力发电|新疆戈壁滩风力发电场微观选址及风电机组选型设计

新疆戈壁滩风力发电场微观选址及风电机组选型设计

罗晓刚

云南水力发电2024,Vol.40Issue(4):1-3,3.
云南水力发电2024,Vol.40Issue(4):1-3,3.DOI:10.3969/j.issn.1006-3951.2024.04.001

新疆戈壁滩风力发电场微观选址及风电机组选型设计

Wind Turbine Selection Design and Micro Site Selection of Gobi Desert Wind Power Plant in Xinjiang

罗晓刚1

作者信息

  • 1. 中国电建集团西北勘测设计研究院有限公司,陕西 西安 710000
  • 折叠

摘要

Abstract

With the implementation of China's national strategic policy of"carbon peaking and carbon neutrality",the supply of clean and low-carbon energy has become a theme of economic and social development.The reform of building a new type of renewable energy system is rapidly advancing.It can effectively develop and utilize Gobi Desert area in Xinjiang,and build wind power stations to supply the scarce electricity in the mainland.For the micro site selection and wind turbine selection of power plants in Gobi Desert of Xinjiang,this paper takes the Milan 200 MW wind power plant project of the 36th Regiment of the Xinjiang Production and Construction Corps Second Division as an example to carry out a systematic scheme design..

关键词

戈壁滩/风力发电场/微观选址/风机选型

Key words

Gobi Desert/wind power plant/micro site selection/wind turbine selection

分类

动力与电气工程

引用本文复制引用

罗晓刚..新疆戈壁滩风力发电场微观选址及风电机组选型设计[J].云南水力发电,2024,40(4):1-3,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文