云南水力发电2024,Vol.40Issue(4):78-81,4.DOI:10.3969/j.issn.1006-3951.2024.04.019
从化高平排涝水闸重建运营方案论证及稳定分析
Demonstration and Stability Analysis of the Reconstruction and Operation Plan for Conghua Gaoping Flood Control Sluice
黄泰华1
作者信息
- 1. 广东鸿禹工程设计有限公司,广东 韶关 512000
- 折叠
摘要
Abstract
The precipitation in the Beijiang River Basin is seasonal and concentrated,with some old water gates having low operating capacity.The nearby water environment is chaotic and does not match the urban development.In response to the current situation and safety hazards of the Gaoping water gate in Conghua District,it is planned to rebuild the gate at its original site.This paper designs the structure of the water gate,calculates the elevation of the top of the water gate and the embankment,obtains the reconstruction and renovation plan of the water gate,and analyzes the stability of the water gate and retaining wall.The results indicate that the reconstruction plan meets the relevant requirements,and after the completion of the renovation project,the drainage capacity of the area has been further improved,improving the water environment in the area.关键词
重建方案/抗洪排涝/水闸重建/水闸稳定性Key words
reconstruction plan/flood control and drainage/reconstruction of sluice/sluice stability分类
建筑与水利引用本文复制引用
黄泰华..从化高平排涝水闸重建运营方案论证及稳定分析[J].云南水力发电,2024,40(4):78-81,4.