| 注册
首页|期刊导航|云南水力发电|基于混凝土铰链排的水利枢纽工程导流明渠防护效果研究

基于混凝土铰链排的水利枢纽工程导流明渠防护效果研究

陈红兵

云南水力发电2024,Vol.40Issue(4):114-117,4.
云南水力发电2024,Vol.40Issue(4):114-117,4.DOI:10.3969/j.issn.1006-3951.2024.04.027

基于混凝土铰链排的水利枢纽工程导流明渠防护效果研究

Research on the Protection Effect of Diversion Channel in Water Conservancy Hub Engineering Based on Concrete Hinge Rows

陈红兵1

作者信息

  • 1. 江西省建洪工程监理咨询有限公司,江西 吉安 343000
  • 折叠

摘要

Abstract

The research aims to explore the protective effect of diversion channels in water conservancy hub projects based on concrete hinge row,in order to meet the stability and safety requirements of diversion channels during floods.The protection of diversion channel is very important,because it is directly related to the safety of the Pearl River auxiliary dam.The study used concrete hinge row as a protective scheme through model experiments and computational analysis,and analyzed its impact on flood velocity and water flow state,as well as its stability and anti erosion ability.The results show that the concrete hinged mattress can effectively reduce the flood velocity,improve the stability of the diversion channel,and have a positive impact on the safety of the the Pearl River Saddle Dam.Based on comprehensive risk assessment and safety analysis,protective engineering has been proven to be feasible and effective.

关键词

混凝土铰链排/水利枢纽工程/导流明渠防护

Key words

concrete hinge row/water control project/protection of diversion channel

分类

建筑与水利

引用本文复制引用

陈红兵..基于混凝土铰链排的水利枢纽工程导流明渠防护效果研究[J].云南水力发电,2024,40(4):114-117,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文