基于水动力模型下的爱联河河道迁建方案
Relocation and Construction Plan of Ailian River Channel Based on Hydrodynamic Model
贺涛1
作者信息
- 1. 深圳市水务规划设计院股份有限公司,广东 深圳 518000
- 折叠
摘要
Abstract
With the continuous development of Chinese economic construction and social living standards,municipal projects such as urban rail transit are also constantly improving and have also achieved good development.Taking Ailian River relocation project as an example,this paper uses Mike 11 model to analyze the current situation of the project and proposes targeted river relocation plans and flood control projects.On the premise of not lowering the flood control standards of the current river channel,the current river channel will be relocated and modified to meet the construction needs of Longcheng Station.At the same time,the rainwater connected along the line will be collected,and the existing river interception pipes built in the current box culvert will be synchronously relocated.It provides necessary guarantees for building an integrated comprehensive transportation hub,facilitating passenger transfer between different lines,and ensuring the passenger flow guarantee of rail transit lines.关键词
水动力模型/河道迁建/雨水管迁/河道防洪Key words
hydrodynamic model/river relocation and construction/rainwater pipe relocation/river flood control分类
建筑与水利引用本文复制引用
贺涛..基于水动力模型下的爱联河河道迁建方案[J].云南水力发电,2024,40(4):165-168,4.